幸运农场选开奖网

关键词:吊桥厂家, 景区吊桥价格, 滑索厂家, 游乐吊桥厂家, 玻璃吊桥, 防腐木吊桥厂商,景区吊桥, 悬索桥设计, 滑索设备, 吊桥生产厂家, 吊桥多少钱, 木板吊桥, 吊桥施工厂家 Welcome to the official website of Xinxiang Wanrong Machinery Co., Ltd.! Keywords: suspension bridge manufacturers, scenic suspension bridge prices, zipline manufacturers, amusement suspension bridge manufacturers, glass suspension bridges, anticorrosive wood suspension bridge manufacturers, scenic suspension bridges, suspension bridge designs, zipline equipment, suspension bridge manufacturers , How much is the suspension bridge, wooden suspension bridge, suspension bridge construction manufacturers

Ten details of the life extension of screening equipment

Release: xxwrjx! @ # $ Browse: 995 times

Screening equipment has been widely used in more and more industries. In the process of use, in addition to operating and maintaining according to the instruction manual, special attention should be paid to some details, which can effectively extend its service life, as follows:

1. Operators should understand the basic structure and working principle of the equipment in detail, and frequently inspect and regularly check, accumulate experience and collect operating data and make records;

2. Before starting the motor each time, check whether the screen is compacted, flattened, and the ring screws are locked;

3. Prior to each start, it is important to check whether the lubrication is good, whether the connecting parts are loose, and whether there are any stagnation between the moving parts, and pay attention to ensure the necessary clearance between all moving parts and fixed parts;

4. When starting each time, ensure that it is carried out under no-load condition. After the operation is stable, the material in the sieve box is drained before stopping.

5. If there is an abnormal situation during operation, it needs to be repaired or routinely maintained. It must be stopped, and it is strictly forbidden to inspect or maintain in operation.

6. Do not turn on the vibration motor before removing the transport fixing plate. Failure to remove the fixing plate before starting may cause damage to the equipment or motor;

7. After the equipment has been running for a period of time, check the damping spring for fatigue in time, and replace it if necessary;

8. After the equipment is put into normal use, necessary routine maintenance and regular maintenance are necessary, especially the lubrication of vibration motor bearings;

9. Whenever possible, use equipment (such as a conveyor belt) to uniformly load materials, and try to avoid manual or excessive material loading, which can protect the vibration screen from damage;

10. Avoid running the vibration motor for 24 hours continuously.

Please pay attention to the above details, I hope to help you!


Recommended products
Name: Boardwalk suspension bridge Wanrong Amusement Equipment Scenic Equipment
Keywords: wooden suspension bridge, Wanrong machinery, Wanrong amusement equipment, Wanrong scenic suspension bridge Name: Wooden board suspension bridge
Keywords: Wooden board suspension bridge, Wanrong machinery, Wanrong machinery suspension bridge, Wanrong amusement equipment Name: Wooden board suspension bridge
Keywords: wooden suspension bridge, Wanrong machinery, Wanrong amusement equipment, Wanrong scenic suspension bridge
contact us

support hotline:

13140591318

Contact: Manager Sun / Manager Du

Phone: 0373-5599811

Fax: 0373-5599505

Mailing address: Zhonglian Road, Xiaoji Town, Xinxiang County

Ranch

company address

Zhonglian Road, Xiaoji Town, Xinxiang County

contact number

15993021001/13937332792/13140591318

mailbox

xxwrjx@163.com

新乡市万荣机械有限公司版权所有备案号: 豫ICP备17011930号-2 Copyright © 2018 Xinxiang Wanrong Machinery Co., Ltd. All rights reserved Record number: Henan ICP No. 17011930-2 [Backstage management]
免费北京赛车群 微信赛车群公众号 pk10实力微信老群 哪里有澳洲幸运5群 幸运飞艇微信平台 2019查询极速赛车开奖历史 靠谱的北京赛车pk10微信群 澳洲幸运5用手机怎么下注 加拿大28实力微信群 哪里找实力急速赛车微信群